Skip to content
Distributed Global Computing

Capabilities

Six parts of the same data center.

These are the work areas, from the first look at a site through the day the load is in operation.

  1. 01

    Site and feasibility

    Whether a location can carry an AI data center: land, access, climate, and the path to a buildable plan.

  2. 02

    Power

    The electrical supply, the interconnection, and the capacity the computing load will actually draw.

  3. 03

    Cooling

    Site conditions, water and energy, system interfaces, and a cooling path that can be maintained.

  4. 04

    Equipment and suppliers

    The IT equipment, the plant, and the suppliers that have to fit the site and the schedule.

  5. 05

    Installation and commissioning

    Receiving, installation, and a witnessed bring-up before the data center is called live.

  6. 06

    Operations and maintenance

    The operating practice after service: spares, monitoring, and the work that keeps the load online.

Contact

Discuss a project, or introduce power and a site.