Power partners
Introduce a power or site opportunity.
For electricity providers, energy developers, and site owners. DGC is looking for power and places where an AI data center can be developed.
Opportunity checklist
What to include with the introduction.
-
The site
Where it is, who controls it, and what is already permitted.
-
The power
Capacity available now, and the interconnection path still required.
-
Water and climate
What the site can support, and what it cannot.
-
The timeline
When power, land, and load need to meet.